Go Back   2023 2024 MBA > MBA > Main Forum

  #1  
Old 15th November 2016, 02:49 PM
Senior Member
 
Join Date: Aug 2012
Default GTU MBA Paper Download

Discuss about gtu MBA paper download here. Welcome to MBA.ind.in and this page is for gtu MBA paper download discussion. If you are looking for gtu MBA paper download then ask your question is as much details as possible in the “Quick Reply” box provided below. The more detailed your question will be, the more easy will it be for our experts to answers your query. And if you have any information on gtu MBA paper download, then please share you knowledge with our viewers in the “Quick Reply” box. You knowledge can help many people. Thanks for stopping by at MBA.ind.in. Please visit again.
Reply With Quote Quick reply to this message
  #2  
Old 2nd April 2018, 03:01 PM
Unregistered
Guest
 
Default Re: gtu MBA paper download

Hello sir, Im doing an MBA from Gujarat Technological University. For exam preparation I want MBA question papers for download. Will you please provide me Gujarat Technological University MBA papers?
Reply With Quote Quick reply to this message
  #3  
Old 2nd April 2018, 03:04 PM
Super Moderator
 
Join Date: Mar 2013
Default Re: gtu MBA paper download

The Gujarat Technological University is admitted candidates for MBA admission. The Gujarat Technological University is also provides question papers.

Gujarat Technological University is a premier academic and research institution which has driven new ways of thinking since its 2007 founding, established by the Government of Gujarat vide Gujarat Act No. 20 of 2007.

Get download Gujarat Technological University MBA papers:



Gujarat Technological University MBA papers:

Subject Code: 2820001 Date: 20/10/2016
Subject Name: Cost and Management Accounting (CMA)
Time: 10.30 am to 01.30 pm Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q. No. 06

Q.1 (a) Cost accounting is an information system developed for:
A. Shareholder B. Government
C. Management D. Financial Institutions

2. Contribution minus fixed costs is
A. Variable cost B. marginal cost
C. unit cost D Profit

3. An increase in the variable cost:
A. Reduces contribution B. Increase in PV ratio
C. Increases margin of safety D. None of the above

4. Another name for direct expenses:
A. Period cost B. Prime cost
C. Variable cost D. Chargeable cost

5. An input of 2500 kgs. of material introduced into the process and the expected normal loss is 8% and if the actual output from the process is 2150 kgs., the abnormal loss is ____________ kgs.
A. 200 B. 150
C. 250 D. 300

6. BEP Means ______________
A. Profit B. Loss
C. Profit & Loss D. No Profit & No Loss

Q.1 (b) 1. Define Cost Accounting
2. List down the steps in Costing Procedure
3. Define Normal and Abnormal Costs
4. Draw the chart for BEP

Q.1 (c) Write note on various elements of Direct cost

Q.2 (a) Discuss Benefits and Limitations of Cost Accounting.

(b) The following particular relate to a new machine purchased:
Purchased price of machine Rs. 400,000
Installation expenses Rs. 100,000
Rent per quarter Rs. 15000
General lighting for the total area Rs. 1000 p.m
Foremen salary Rs. 30,000 p.a.
Insurance premium for the machine RS. 3000 p.a.
Estimated repairs for the machines Rs. 5000 p.a.
Estimated consumable store Rs. 4000 p.a.
Power 2 units per hour at Rs. 50 per 100 Units

Estimated life of the machine is 10 years and the estimated value at the end of the 10 year is Rs. 100,000. The machine is expected to run 20000 hours in its life time. The machine occupies 25% of the total area. The foremen devotes 1/6 of his time for the machine. Calculate the machine hour rate for the machine.

OR

(b) The following direct costs were incurred on Job No. 415 of Standard Radio Company.
Materials Rs. 6010

Wages:
Deptt: A 60 hours @ Rs. 30 per hr
B 40 hours @ Rs. 20 per hr
C 20 hours @ Rs. 50 per hr

Overhead for these three departments were estimated as follow: Variable overheads:
Deptt: A Rs 15000 for 1500 labour hours
B Rs. 4000 for 200 labour hours
C RS. 12000 for 300 labour hours

Fixed overheads:
Estimated at Rs. 40000 for 2000 normal working hours. You are required to calculate the cost of Job 415 and calculate the price to give profit of 25% on selling price.
Reply With Quote Quick reply to this message
Reply

Similar Threads
Thread Thread Starter Forum Replies Last Post
SSC Tax Assistant Paper Download Unregistered Main Forum 2 25th November 2019 04:50 PM
SMU MBA Paper download neetu Main Forum 3 23rd November 2019 03:11 PM
MAH MBA CET Question Paper Download payal Online MBA Discussions 3 23rd November 2019 02:05 PM
IIT Question Paper Download Pradeep Kumar Dash Main Forum 2 16th November 2019 02:42 PM
mba cet question paper download suman Main Forum 2 17th April 2018 09:53 AM
SMU MBA Sample Paper Download neetu Main Forum 2 12th April 2018 08:51 AM
IPU CET Question Paper Download Unregistered Main Forum 4 10th April 2018 10:06 AM
MBA Exam Paper Download kavita Online MBA Discussions 2 6th April 2018 10:11 AM
MBA Paper Download payal Online MBA Discussions 2 6th April 2018 09:59 AM
SMU MBA Question Paper Download munna Main Forum 2 4th April 2018 05:00 PM
MBA Sample Paper Download mamta Online MBA Discussions 3 2nd April 2018 12:43 PM
Gtu mba sem 1 paper download kavita Online MBA Discussions 2 31st March 2018 03:06 PM
MBA Entrance Paper Download kavita Online MBA Discussions 2 28th March 2018 02:39 PM
PTU DEP MBA Question Paper Download neetu Main Forum 2 22nd March 2018 03:56 PM
Download NDA Paper Unregistered Main Forum 2 22nd March 2018 03:43 PM
BITSAT Paper Download Unregistered Main Forum 1 14th October 2016 03:18 PM
TET Sample Paper download anupamyadavn Main Forum 1 1st November 2012 03:25 PM
Download BSNL JTO Paper Azra.e Main Forum 1 25th September 2012 11:42 AM
CDS Question Paper Download suleman ahmed Main Forum 1 31st July 2012 08:02 PM
GCET paper download Onkar Singh Moond Main Forum 3 29th July 2012 06:14 PM


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5.5. The time now is 07:11 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2