#2
| |||
| |||
Re: IIT Roorkee Solar
IIT Roorkee faculty and students have led initiatives to save significant electricity by conducting an energy audit, developing policy for reducing electricity consumption and energy conservation and using solar energy for reducing carbon footprint It has installed following solar energy system during the year 2013 15. Solar PV (1.81 MW) for electricity generation (about 25 lacs unitsannual), Commissioned in April 2014 with 25 years contract of maintenance at the cost of Rs. 15.90 crores with the subsidy from MNRE of Rs. 12.84 crores. Water heating (4.4 Lac liters per day) covering entire campus. Commissioned in Dec 2014 with 20 years contract of maintenance at the cost of Rs. 11.93 crores with the subsidy from MNRE of Rs. 2.85 crores for 3.5 lacs lpd. Solar steam for cooking (students hostels 9 nos. equivalent to 5,000 cylinders of 14.2 kg LPG annually) Commissioned during July 2014 to Oct 2015 with 20 years contract of operation and maintenance at the cost of Rs. 2.59 crores for five years with the subsidy from MNRE of Rs. 1.05 crores. SOLAR PHOTOVOLTAIC SYSTEM: Site (Departments / Centers) Roof Area Peak Power (sq.m.) Output (kWp) Alternate Hydro Energy Center 658.6 42 Dept of Architecture & Planning 1050.6 66 Geomatics engg 767.6 60 Dept of Civil Engineering 2734.7 200 Department of Chemistry 1263.9 61 Dept of Chemical Engg 2069.5 119 Dept of Management Studies 1166.2 40 Dept of Earthquake Engg 1540.7 66 Dept of Earth Science 535.1 50 Institute Computer Center 615.6 32 Water Resource Development &Mgnt 786.3 43 Dept of Electronics and Computer Engg 2180.3 114 Dept of Electrical Engg 3273.1 170 Dept of Humanities and Sciences 659.3 35 Dept of Hydrology 577.2 26 SOLAR WATER HEATING SYSTEM: In IIT Roorkee campus, solar water heaters systems with various capacities (100 LPD, 200 LPD, 300 LPD, 500 LPD, 750 LPD, 1000 LPD, 1500 LPD, 2000 LPD, 2500 LPD, 3000 LPD) has been installed for all possible installations in Bhawans (hostels), faculty residences and guest houses. There are 12 hostels, 2 guest houses and 14 residential areas covering all staff, students. A total of 4.35 lacs litre per day of installed capacity systems have been installed. For more Information you may Consider the below Attachement that is Free to Download Comprehensive Solar installations in IIT Roorkee Campus |
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
KIH IIT Roorkee | Unregistered | Main Forum | 1 | 3rd February 2018 05:04 PM |
Gym In IIT Roorkee | Unregistered | Main Forum | 1 | 29th January 2018 05:10 PM |
IIT Roorkee IGC | Unregistered | Main Forum | 1 | 5th May 2017 01:17 PM |
IOCL Solar Tender | Unregistered | Main Forum | 1 | 5th December 2016 02:03 PM |
IREDA Solar Projects List | Unregistered | Main Forum | 1 | 3rd December 2016 12:21 PM |
ONGC Solar | Unregistered | Main Forum | 1 | 28th November 2016 03:32 PM |
IIT Roorkee Vacations | Unregistered | Main Forum | 1 | 24th October 2016 05:30 PM |
DTU Vs IIT Roorkee | Unregistered | Main Forum | 1 | 20th October 2016 09:40 AM |
IIT Roorkee UK | Unregistered | Main Forum | 1 | 17th October 2016 10:40 AM |
IIT Roorkee Sem | Unregistered | Main Forum | 1 | 6th October 2016 09:20 AM |
IMS Roorkee MBA Result | Unregistered | Main Forum | 1 | 7th November 2015 04:34 PM |
Phd IIT Roorkee | Unregistered | Main Forum | 0 | 18th July 2015 09:12 AM |
KELTRON solar | Unregistered | Main Forum | 0 | 17th July 2015 03:18 PM |
IIT Roorkee map | Unregistered | Main Forum | 0 | 17th July 2015 02:19 PM |
MBA at IIT Roorkee | Unregistered | Main Forum | 0 | 17th July 2015 11:57 AM |
KSEB Solar Shift | Unregistered | Main Forum | 0 | 16th July 2015 04:47 PM |
IREDA GBI Solar | Unregistered | Main Forum | 0 | 14th July 2015 03:37 PM |
Syndicate Bank Solar Loan | Unregistered | Main Forum | 0 | 9th July 2015 02:45 PM |
IIT Roorkee VSM | Unregistered | Main Forum | 0 | 8th July 2015 05:07 PM |
Indian Institute of Technology Roorkee Roorkee Uttarakhand | manojnairkgg | Main Forum | 1 | 11th October 2012 05:23 PM |
|