When the Talcher Thermal Power Station of National Thermal Power Corporation (NTPC) was established? Can you please tell me the aim and the mission of this Power Station? Also provide me all the details about Talcher Thermal Power Station?
Reply With Quote Quick reply to this message
  #2  
Old 13th March 2018, 08:34 AM
Unregistered
Guest
 
Default Re: Ttps ntpc

Hello sir, is there any one can provide me here detail about the Talcher Thermal Power Station of National Thermal Power Corporation Limited?
Reply With Quote Quick reply to this message
  #3  
Old 13th March 2018, 08:34 AM
Super Moderator
 
Join Date: Mar 2013
Default Re: Ttps ntpc

The National Thermal Power Corporation Limited is introduced its Talcher Thermal Power Station.

The Talcher Thermal Power station is located in Talcher sub-division of Angul district in the Indian state of Odisha Pin.759101.

The power plant is one of the coal-based plants of NTPC.

The coal for the power plant is sourced from Jagannath Mines of Mahanadi Coalfields Limited.

TTPS achieved the highest ever power generation among all the power plants in the country in a single day at 104.13% PLF.

Capacity
4 units of 60 MW each
2 units of 110 MW of each
The total capacity is 460 MW.

Talcher Thermal Power station overview:

Address
P.O. Talcher Thermal Dist. Angul-759 101, Orissa

Telephone
(STD-06760) - 249101

Fax
249053

Approved capacity
460 MW

Installed Capacity
460 MW

Location
Angul, Orissa

Coal Source
Jagannath Mines of MCL
Water Source
Brahmini River

Beneficiary States
Orissa

Approved Investment
Rs.356 Crore (Total consideration for the transfer from OSEB to NTPC payable by NTPC).

Unit Sizes
4x60 MW
2x110 MW
Taken over from Orissa state Electricity Board on 03.06.95
Reply With Quote Quick reply to this message
Reply

Similar Threads
Thread Thread Starter Forum Replies Last Post
Ntpc gk Unregistered Main Forum 2 24th February 2018 10:02 AM
NTPC Careers MBA Unregistered Main Forum 1 10th November 2015 05:26 PM
Ntpc upl Unregistered Main Forum 0 18th July 2015 01:00 PM
NTPC GM finance Unregistered Main Forum 0 18th July 2015 09:46 AM
Ntpc mw Unregistered Main Forum 0 17th July 2015 05:00 PM
Ntpc ntecl jv Unregistered Main Forum 0 16th July 2015 03:44 PM
Ntpc gzb Unregistered Main Forum 0 15th July 2015 12:18 PM
Rrb bpl ntpc Unregistered Main Forum 0 15th July 2015 11:02 AM
Gm hr ntpc Unregistered Main Forum 0 14th July 2015 10:21 AM
Ntpc 200 dma Unregistered Main Forum 0 13th July 2015 05:21 PM
NTPC Gajmara Unregistered Main Forum 0 13th July 2015 01:27 PM
Ntpc ns Unregistered Main Forum 0 13th July 2015 10:12 AM
Ntpc fpo date Unregistered Main Forum 0 11th July 2015 05:18 PM
NTPC Durgapur Unregistered Main Forum 0 11th July 2015 03:33 PM
What is NTPC Graduate Unregistered Main Forum 0 10th July 2015 03:31 PM
NTPC Punchline Unregistered Main Forum 0 10th July 2015 03:10 PM
Kaniha NTPC Unregistered Main Forum 0 10th July 2015 02:30 PM
Ntpc plf Unregistered Main Forum 0 10th July 2015 01:22 PM
Ntpc iim Unregistered Main Forum 0 9th July 2015 01:36 PM
Job for ntpc Unregistered Main Forum 0 9th July 2015 01:36 PM


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5.5. The time now is 08:30 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2