22nd February 2018 02:12 PM | |
shikha | Re: Mumbai Metro Rail When Started Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra, and the wider MMR urban agglomeration. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai Suburban Railway (colloquially called local trains) network. It is being built in three phases over a 15-year period, with overall completion expected in 2025. When completed, the core system will comprise eight high-capacity metro railway lines, spanning a total of 235 kilometres (146 mi) (24% underground, the rest elevated, with a minuscule portion built at-grade), and serviced by 200 stations. Line 1 of the Mumbai Metro system is operated by Metro One Operation Private Limited (MOOPL) While lines 2, 7 (under construction) and 4 (bidding in progress) will be built by MMRDA, the completely underground line 3 (also under construction) will be built by Mumbai Metro Railway Corporation Limited (MMRCL). The main objective of the Mumbai Metro is to provide mass rapid transit services to people within an approach distance of between 1 and 2 kilometres, and to serve the areas not connected by the existing Suburban Rail network. Contact- Mumbai Metro Rail Corporation Limited, NaMTTRI Building, Plot No. R-13, |
22nd February 2018 02:12 PM | |
Unregistered | Re: Mumbai Metro Rail When Started When the Mumbai Metro Rail Corporation Limited (MMRC) will start? Also provide me the details of the company? |
7th July 2015 10:31 AM | |
Unregistered | Mumbai Metro Rail When Started I am writing an article on Mumbai Metro Rail that’s why I have requirement of its detailed information. Would you please tell me when was Mumbai Metro Rail Started? Please provide me schedule of all the Metro Trains with their Fair. Can you provide me its Junction Map? |